estacades compiegnes

France – Compiegne

Project description

Pier on the Oise river with access platforms to cofferdams, sheetpiles driven with a 23 HFV vibrohammer.

Other projects

estacades sandrancourt

France – Sandrancourt

Project description

Unloading quay on the Seine river for demolition wastes used for quarry backfilling.

Quay for barges moving under unloading excavator.

Other projects

estacades bayonne

France – Bayonne

Project description

Pier on the Adour river, 185 m length with self-supporting floors of 12,5 m allowing the replacement of a SNCF bridge.

3 levels proppings  installed before driving of sheetpiles.

Other projects

estacades_1

France – Bordeaux

Project description

Pier on the Garonne river, 330 m length with 3 platforms of 30 m along cofferdams allowing the replacement of the SNCF bridge.

Erecting of main beams of 20 m with bracing.

Other projects

estacades ponts ce

France – Les ponts de Ce

Project description

Pier on the Loire river, 560 m length, allowing the motorway enlargement with a width usable by vehicles of 7,50 m.

Other projects

estacades oissel

France – Oissel

Project description

Pier on the seine river, 140 m length x 6,40 m width allowing the sideway movement of a SNCF bridge.

Piling of tubes diameter 1800 with a S90 hydraulic hammer.

Other projects

estacades pantin

France – Pantin

Project description

Plant for sand and aggregates unloading for concrete plant with walkways and stairways suppling access to barge depending of size and  freeboard and a platform for an excavator isolated from the quay by a drawbridge.

Other projects

estacades saumur

France – Saumur

Project description

Estacade sur la Loire de 340 m de long avec des portées de 20 m permettant l’élargissement du pont du Cadre Noir.

Mise en fiche des pieux avec guide sur appuis provisoires.

Other projects